Contractor brought a "feller" with him this morning, for demo. They're cutting the shower in two, now, and filling house with poison gas/burning 45 yo plastic SO BAD. I hope they're wearing respirators.....
guessing they're not.
I turned off AC, opened windows for cross breeze, and took pug outside.
We're tiling everything, so all wallpaper covered sheetrock is going.....I think I've stacked 40sf of tile in bedroom attached to that bathroom......the "gas" interrupted my process.
Contractor doesn't want to tile behind new vanity, but I'm thinking we will, if I have enough tile.
They now have classic rock going ....I was wondering when that would start.
I have a twitchy bad feeling around helper Robert. He's argumentative with Biggy, and has tossed his tools once already, reminding me of nutter contractor.
Will pay him cash,for the day, and assume that's the end of him. Certainly, won't be introducing him to DDs.
The pug finally calmed down.
I'm going to put a blanket up in hallway, while holding my breathe. I think my respirator is at lake. I know it is.